Back To Facilities

Combustible Case Production Facility

Integrated facility approach focused on safety, traceability, and quality assurance for the production of combustible case components for high-caliber systems.

Strategic Production Capability

The facility concept gathers the controlled production environment, process safety, quality assurance, and traceability architecture needed for the production of combustible case components for high-caliber platforms under one roof. The goal is to create not only capacity but also sustainable supply and auditable production discipline.

  • Production Discipline Suitable For The Defense Industry
  • Traceability And Batch Management (lot/batch Approach)
  • Auditable Quality Assurance Infrastructure
  • Scalable Facility Architecture
Combustible Case Production Process

Production Lifecycle

1

Raw Material & Compliance Management

Acceptance, Classification, Traceability

View Details
2

Safe Production Discipline

Controlled Areas, Procedure-Based Operation

View Details
3

Quality Assurance

In-Process Controls, Recording And Audit Infrastructure

View Details
4

Safety & Risk Management

Atex Approach, Safety Plc, Fail-Safe Architecture

View Details
5

Packaging & Safe Storage

Separation Scenarios, Logistics Preparation, Traceable Shipment

View Details

Compliance With Material And Product Architecture

In combustible case applications, material behavior, environmental stability, and operational safety are critical. Therefore, the facility is designed with control points throughout the entire flow from material acceptance to final shipment.

  • Raw Material Acceptance And Compliance Verification
  • Controlled Production Areas And Process Disciplines
  • Approach Focused On Product Stability And Shelf Life
  • Safety Priority In Packaging And Storage

Engineering And Safety Approach

The entire facility approach is built on ATEX / Ex-proof design principles, Safety PLC, fail-safe architecture, risk analyses, and zone management. The goal here is clear: human safety, facility safety, and operational continuity.

  • Atex / Ex-Proof Design Approach
  • Safety Plc And Secure Automation Architecture
  • Zone Classification And Risk Analyses
  • Redundant, Fail-Safe System Philosophy

Quality Assurance And Auditable Production

In defense industry projects, 'producing' alone is not enough; provable quality is required. Therefore, the facility relies on a strong backbone in quality control, documentation, and traceability.

  • Batch-Based Traceability And Record Management
  • Quality Control Plan And Acceptance Criteria Approach
  • In-Process Control Points
  • Documentation Discipline Ready For Audits

Packaging, Logistics And Safe Storage

Due to product characteristics, packaging and storage are as critical as the continuation of production. Areas are planned considering safety distances, separation scenarios, and controlled environmental conditions.

  • Controlled Storage Approach (environmental Condition Management)
  • Safety Distances And Separation Scenarios
  • Shipment Preparation And Traceable Labeling
  • Procedure-Based Safe Operation

Compliance With Defense Industry Standards

Bakar Makina's approach is to establish not just a product line, but a strategic production capability. Therefore, the facility concept addresses compliance, safety, quality, and sustainable operation criteria together.

  • Quality And Safety Culture Suitable For Military Projects
  • Transparent, Auditable Process Approach
  • Operational Continuity And Supply Security
  • Architecture Suitable For Future Capacity Increase
Detailed View 1
Detailed View 2

Summary: Strategic Production Capability

The Combustible Cartridge Case Plant (125mm) approach aims for an infrastructure suitable for defense industry supply discipline with high security, traceable, and auditable production architecture.

This investment is for institutions that want to establish strategic production capability rather than a single product line.

Contact Us

Contact Our Technical Team For Your Combustible Case Production Facility Projects.

Request Technical Meeting